TitleProduct

Stainless Steel Customized Accumulating Roller for Conveyor

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-23 08:11

  • Browse the number:

    83

Send an inquiries

Company Profile

Jiangsu Double Arrow Conveyor Machinery Co., Ltd.

By certification [File Integrity]

Contact:Mrs. Iris Qiu(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://hzmaolian.hbhryq.com/

PRODUCT DETAILS
Single sprocket stainless steel customized accumulating roller

Product Description
Internal thread type

Technical data:
Material

Diameter D

(mm)

Thickness t

(mm)

Diameter d

(mm)

Length L

(mm)

Bearing
Steel, zinc 50 1.5 12 (M8*15) L=W+70 6201,6001
plated 60 2.0 15 (M10*20) L=W+70 6001,6002
  76 3.0 20 (M12*25) L=W+78 6204,6004
  80 3.0 20 (M12*25) L=W+78 6204,6004
  89 3.0 20 (M12*25) L=W+78 6204,6004
Stainless 50 1.5 12 (M8*15) L=W+70 6201,6001
steel 60 2.0 15 (M10*20) L=W+70 6001,6002
  76 3.0 20 (M12*25) L=W+78 6204,6004
Aluminium 50 1.5 12 (M8*15) L=W+70 6201,6001
alloy 60 2.0 15 (M10*20) L=W+70 6001,6002
  76 3.0 20 (M12*25) L=W+78 6204,6004
 
Diameter D (mm) A B d1 Sprocket type
Φ 50 17 22 Φ45.08 08B11T
Φ 60 17 22 Φ57.07 08B14T
Φ 76/80/89 20 25 Φ66.33 10A13T

Packaging M
General

This inspection procedure states the method and way of recording the measuring of the manufacturing tolerances for the product.
Inspection and reporting is where nothing else is stated done by MechTouch.

Method

Each roller has to be checked regarding:

1. That the individual marking is correct and intact.

2. The total roller length.

3. The lengths of the shafts.

4. That the holes in the shafts are correctly positioned.

5. That the shafts are undamaged.

6. The out of truth in five positions using a dial test indicator.

7. That the welds, according to the drawing, are correct.

Checking List

1. Correct wood has been used as packing material.

2. The goods have been packed so it cannot move during transportation.

3. The container or truck has been filled up with goods.

4. A forklift is enough to unload the goods on site.

5. No package weighs more than 4000(kg).

6. The goods is packed without metal to metal contact.

7. Marking of the individual components has been done.

8. Packing list is present and clearly visible.

9. Pictures of marking and packaging have been sent to the customer.

Pallet & case

Factory M
Manufacture

Quality Detection

Picture


R&D